To reduce risk, apply the following controls in this order:

  1. Eliminate – Remove the hazard completely

  2. Substitute – Use something less hazardous

  3. Isolate – Restrict access to the hazard

  4. Engineer – Design safer tools or processes

  5. Administrative – Introduce policies, training, signage

  6. PPE – Provide protective clothing or equipment

Example: Use a mop bucket trolley to reduce strain = engineering control.

Views
4 Total Views
4 Members Views
0 Public Views
Actions
0 Likes
0 Dislikes
0 Comments
Share on Social Networks
Share Link
Share by mail

Please login to share this webpage by email.